Production Scheduling and Mine Fleet Assignment Using
programming (Michiotis et al, 1998), mixed integer programming for scheduling a fleet of mining trucks such that maintenance cost is minimized (Topal and Ramazan, 2010). Elbrond and Sournis, (1987) developed a relation between production scheduling and fleet assignment. Since both the